Abstract:
The 3rd artificial island in Jidong field is surrounded by sea, with the area of 200 acres. To accelerate Oilfield develop-ment and achieve the objective of operation with multi rigs simultaneously without affecting each other, multiwell cluster is taken as the well deployment ways. Through optimizing plans, the upper wellbore collision is reasonably avoided. According to the characteristics of great number of high angle deviated wells and collapse tend of the formation with low drillability because of the big vertical section of basaltic layers in Guantao formation, the wellbore structure optimization, drilling fluid development, bid screening and drilling tech-niques were studied, taking Well NP13-X1046 and NP13-X1042 as examples. And it was applied in onsite drilling operations, which made the drilling process of high angle deviated wells successful in the island.