DEEP WELL SIDETRACKED TECHNOLOGY OF YAKEN-3 WELL
-
-
Abstract
Design depth of Yaken-3,in North Talimu,is 6200 meters,while drilling to 5546.33 meters,the strick is happened in salt.The drill collar is broken in treating.So the sidetracked is started.The first sidetracked is failure because of downhole motor.The second kop is selected in 51 00 meters.Under deep well,high temperature(112℃),high pressure(drilling fluid density is 1.74g/cm3),poor drillability,it is successful to sidetracked using downhole motor and SST tool.It is successful to send the177.8mm liner to 5658.73 meters.
-
-