LIU Yongwang, GAUN Zhichuan, SHI Yucai, WEI Kai, ZHANG Su, SHAO Dongdong. Discussion on problems of wellbore anti-collision technology and active anti-collision methods[J]. Oil Drilling & Production Technology, 2011, 33(6): 14-18.
Citation: LIU Yongwang, GAUN Zhichuan, SHI Yucai, WEI Kai, ZHANG Su, SHAO Dongdong. Discussion on problems of wellbore anti-collision technology and active anti-collision methods[J]. Oil Drilling & Production Technology, 2011, 33(6): 14-18.

Discussion on problems of wellbore anti-collision technology and active anti-collision methods

  • Wellbore collision may bring the potentially catastrophic results to human and environment. The wellbore anti-collision technology in order to reduce such accidents is difficult to meet the current needs of field drilling. Through the analysis of present anti-collision technology based on the trajectory measurement and calculation theory and practice, four factors could be concluded causing the failure of wellbore anti-collision, which were big data error of survey steering, low accuracy or loss of adjacent well trajectory data, over-idealized path matching method, and defect of scanning method for anti-collision. The well trajectory matched by the low accuracy parameter and the over-idealized matching method could not meet the actual one. Therefore, the concept of active anti-collision was put forward, and it could be the development tendency of anti-collision technology in the future. Three possible active anti-collision programs were listed, which were acoustic wave detection anti-collision program, electromagnetic wave detection anti-collision program, and ray detection anti-collision program. And the principle and the advantages and disadvantages of the programs were illustrated.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return